3 meters 3 roll industrial ironing machine
Product Type: | Textile Machinery >> Clothing Industry Equipment >> Other |
|
---|---|---|
Keyword: | Machinery,Apparel Machinery,Industrial Garment Steamers | |
Uses: | ||
Origin: | China/Jiangsu | |
If you are interested, please contact us!
| ||
MOQ: | 1 Set/Sets 1000 sets /month | |
FOB price: | US $7,980 - 11,109 / Set Negotiable | |
Port: | shanghai | |
Payment Terms: | L/C,T/T,Western Union | |
Production Capacity: | 7-15days | |
Packing: | wood case If there are other packaging need, please enquiry | |
Delivery Time: | 1000 Set/Sets per Day |
- Place of Origin: Jiangsu China (Mainland)
- Model Number: TP|||-3000
- material: High quality stainless steel
- Brand Name: Hangxing
1.Market :Asia, Europe, America and Africa
2.Energy efficient,safe, simple operation
3.ISO9001,CE/UL/GS/VDR Approved
Execution standard: (2004) T2000 QB /
modeTPIII-3000 | TPIII-3000 |
Pressing range(mm)L*W*T | More than3000×3 |
Cylinder size 800×lenght(mm) | 800×3000 |
Drum (only) | 3 |
steam pressure(r/mpa) | 0.4-0.8 |
Steam consumptionkg | 230 |
Pressing speed(m/min) | 0-15 |
Electric power(kw) | 1.5 |
Inverter power(kw) | 3 |
Electric heating power(kw) | / |
Envelop dimensions(mm) | 4000×3400×1500 |
Envelop dimensions(mm) | 4200×3700×1700 |
overall weight(kg) | 4700 |
Features
1: the machine adopts speed-adjusted, user-friendly, according to the different thickness of the fabric and fabric, choose appropriate pressing speed.
2: the transmission, the inlet steam and hydrophobic system in both cases respectively, appearance, compact structure, small volume.
3: the machine adopts roller through pressure steam heating roller surface, the method is energized electrical heating (directly), heating roller surface fabric wrinkles, make to the drying.
Four: the machine is in the conveying system set up corresponding, make more tensioner fabric.
Five: the machine adopts gear speed reducer big. By the chain transmission, overload ability, low noise, the chain has tensioning devise firmness, convenient adjustment.
6: the machine adopts wide belt transmission, and mitigate every lap, to avoid the burst apart in the transmission of the difficulty to solve swim phenomenon, at the same time the clasp with convenient, replacement.
7: the machine is equipped with safety valve, steam imported before they have tuned and normal work, it does not need to adjust.
8: the machine with low temperature layers with isolation, ensure fabric direction without binding phenomenon, it can achieve the desired size fabric of iron.
Operation
1: in the fabric, before pressing roller surface will be clean, reoccupy soft cloth to each roller surface and machine to ensure the machine to wipe clean.
2: motors and other control must be through insulation inspection, examination empty chance is normal or not convey.
3: check the oil hole, and inject unblocked adequate lubricating oil in the reducer, add oil 20-40.
4: adjust conveyor belt, not too close or too loose.
5: open the inlet and outlet valve, the first two waterfront through more clean water within it, close to split water valve, steam pressure to 0.6 mpa 0.4 - when starting motor.
6: will speed motor controller or frequency converter, slowly turn knob opens.
7: will the fabric on after dehydration in conveyor belt, input needs ironing area.
8: according to the fabric, will speed controller needs tuning knob to the right or inverter, the normal operation of the position
Maintenance and maintenance
1: machine use after period of time, to turn to fill lube periodic components.
2: machine happened not murmur, shall be immediately downtime repair. The normal use of six months after maintenance, replacement should stop the machine of decelerate of oil, the bearing fill lube respectively.
3: if long time don't use machine, should be removed, will be brought into the transmission parts drum clothes clean, sealing.
Four: the relief valve to check whether the normal work, must send labor department.
According to the state administration of 5: labor security supervision code, pressure containers for at least a year to user drum, such as a visual inspection found a crack, hu deformation, other abnormal phenomenon, should be handled in time, when necessary, replace roller.
Installation method
1: the machine is installed without special requirement, but must be based on a smooth machine for cement, and keep around the operating position is 1.5 meters and maintenance.
2: the machine after installation, please use steam roller leveling instrument calibration.
3: installation should consider the machine into steam trap and pipeline.
4: machine installation must grounding, lest produce an accident.